Since the last post, about a couple of weeks ago, not much had been done as there had to be an inspection by the Fairhope inspectors. After the piping, electrical and HVAC install there is one last 'major' inspection. Reason being that now the wall …
Quail Creek House
16-29August-2015 Bunker Loop House
As you have noticed there have been no posts for the past couple of weeks. Not to worry things have been going on at a normal pace. The last pictures were from 15-Aug wherein they had gotten the 'felt' on the roof. This was a Saturday - well the next …
13-15August-2015 Bunker Loop House
This is for the past three days. As you can see quite a bit has been done and the house is now dried in. A LOT of the work has been done on the inside as regards applying required bracing to all of the components. Most all of the bracing consists of …
12-August-2015 Bunker Loop House
Looking at the pictures it may seem like not much at all has been done today. But don't let first glance fool you. Today there was a lot of detail work done. The framing for the eves is being worked on, the roof trusses have to have braces/spacers …
11-August-2015 Bunker Loop House
They are really working on the place. Is about six or seven people doing the work and they really seem to know what they are doing. Today they got the windows and doors framed in and the roof framed. As you can see from some of the shots the roof …